
Berry Hill STW
As part of the overall site refurbishment program, Nomenca have contracted Utile to design, supply and install a 1350m3 Sattler double membrane gas holder for this Wessex Water site.

As part of the overall site refurbishment program, Nomenca have contracted Utile to design, supply and install a 1350m3 Sattler double membrane gas holder for this Wessex Water site.

Working with Nomenca, this South West Water site has had its 20 year old 170m3 Sattler gas holder renewed by Utile with a direct replacement, again manufactured by Sattler.

Through Doosan Enpure, Utile have supplied a 570m3 Sattler Double Membrane gas holder to this States of Jersey sludge treatment centre on the Island of Jersey.

Utile have been commissioned by Smurfitt Kappa to install a 400m3 Sattler double membrane gas holder as part of the new AD facility at this Industrial paper processing plant.

Contracted by Interserve Construction Ltd, Utile have been awarded the contract to supply and install a 1040m3 Sattler, double membrane gas holder for this food waste processing plant.

Under AMP 5 and in association with North Midland Construction, Utile have been contracted to supply and install a new Sattler, double membrane Gas Holder, volume 270m3 to replace an old steel tank unit.