Southport STW

Southport STW

Contracted by Eric Wright Water we recently supplied and installed a Sattler 3200m3 Model B9 125/250 double membrane gas holder for United Utilities.

Bran Sands STW

Bran Sands STW

In May 2018 we supplied and installed the first Sattler 1190m3 Model B9 118/250 double membrane gas holder to replace the Kirk Biodome GS218.

Bran Sands STW

Bran Sands STW

Contracted by Northumbrian Water direct, Utile have been chosen to replace the 2No. Kirk Biodome GS218 gas holders with Sattler 1190m3 Model B9 118/250.

Banbury STW – Thames Water – Gas Holder

Banbury STW – Thames Water – Gas Holder

This site had a Sattler 1350m3 double membrane gas holder, installed in 1994 therefore boasting over 20 years of trouble free operation. Utile, being the long standing UK sole distributor for Sattler double membrane gas holders were contracted by TWUL direct to provide an exact replacement, as the existing unit was at the end of its design life.

Wargrave STW

Wargrave STW

Contracted by Costain through the Eight 2 0 Partnership, Utile have recently designed, installed and commissioned an 1100m3 Sattler Double Membrane Gas Holder, at, Thames Water Utilities Wargrave STW site.