Bellozanne STW

Bellozanne STW

Through Doosan Enpure, Utile have supplied a duty/standby biogas booster package to feed the hot water boilers and Waste Gas Burner.

Ardagh Glass – Natural Gas Package

Ardagh Glass – Natural Gas Package

Having worked with this company previously, we were approached again, to design and supply a duty standby, natural gas booster package to feed their new glass furnace with raised gas pressure from the main.

AD Plant – Granville Ecopark Ltd

AD Plant – Granville Ecopark Ltd

Working alongside Veolia Water once more, Utile have supplied a double (duty & standby) gas booster package with acoustic enclosures, and all relevant mechanical and electrical protection equipment in accordance with ATEX and DSEAR requirements, for installation in a zone 1 area.

Becton & Crossness STW – Thames Water

Becton & Crossness STW – Thames Water

Through the AMP 5 Tamesis Joint Venture, Utile have supplied each of these sites with triple (duty, assist & standby) gas booster packages with acoustic enclosures, non return valves, protection switches and gas line isolation valves.

Esholt STW – Yorkshire Water

Esholt STW – Yorkshire Water

In association with Morgan Sindall Grontmij JV, Utile are contracted to supply new equipment for the Bio-Energy Plant which extends the existing plant and up-grades to an advanced digestion process of Thermal Hydrolysis Process (THP).

Riverside STW – Thames Water Utilities Ltd

Riverside STW – Thames Water Utilities Ltd

Interserve Project Services Ltd (IPSL) chose Utile to design, supply, install and commission 2No. 4050m3 Sattler, double membrane gas holder to this site for TWUL.