


Utile Gas Boosters
Contracted by Ener-G once again, Utile have supplied 8No. natural gas booster packages to supply elevated gas pressure to feed their CHP engines installed on an 18 MWatt gas fired STOR and Peak Power lopping power station.

Burnley STW
As part of United Utilities Water plc, AMP5 Capital Delivery, Utile were selected to partner KMI Plus, (a joint venture between Keir, J Murphy, Interserve and Mouchel) to deliver the Biogas boosters for gas transportation to the new Waste Gas Burner, forming part of the Burnley Sludge THP Project.

Maple Lodge STW
As part of Thames Water Utilities Ltd, AMP6 Capital Delivery, Utile were selected to partner Atkins to deliver the Biogas boosters for gas transportation to the Boiler and CHP plant forming part of the Maple Lodge STW CHP upgrade.

US Embassy – London
Contracted by Wolseley UK Ltd once again, Utile designed and built a duty/standby natural gas booster package to supply elevated gas pressure to feed the Kitchen equipment, Hot Water Boilers and CHP plant recently installed at the New US Embassy building in London.

Yellow Power
Utile were chosen by Yellow Power, to design and supply 4No. Model H32 reciprocating Gas Booster Packages to feed high pressure gas to their Jenbacher 620 engine generators.