Poole STW

Poole STW

Contracted by Galliford Try for Wessex Water, Utile have designed, supplied and installed on a turnkey basis, the 850m3 Double Membrane Gas Holder, 3No. Digester Gas Mixing Systems and 2No. Biogas Boosters sets for this site refurbishment. Final commissioning of this plant is due within 2024.

Southbank Place – Borough Engineering

Southbank Place – Borough Engineering

Contracted by Borough Engineering, this duty/standby natural gas booster package is destined for Southbank Place, Canary Wharf, London. Fully packaged to IGE/UP/2, UKCA and ATEX standards for installation within a zoned area, it comes fully CompEx wired.

Tewkesbury Site – YLEM Power

Tewkesbury Site – YLEM Power

Utile has supplied a double (duty & assist) gas booster package with acoustic enclosures, and all relevant mechanical and electrical protection equipment in accordance with IGEM/UP/2, EPS, and CE requirements, for installation in a large manufacturing facility to raise the mains gas pressure feeding the new CHP system.

Lundwood STW

Lundwood STW

Utile were chosen to replace the original Kirk Environmental tank mounted double membrane gas holders at this Yorkshire Water site with Sattler 624m3 Model DMGS-TM-16.76M versions.

St Helens – J Murphy & Sons

St Helens – J Murphy & Sons

Contracted by J Murphy & Sons, Utile have supplied a double (duty & assist) gas booster package with acoustic enclosures, and all relevant mechanical and electrical protection equipment in accordance with IGEM/UP/2 and CE requirements, for installation in the...