Kidderminster STW

Kidderminster STW

In May 2021 Utile were awarded the contract by S T Water to replace the existing Sattler gas holder on this site, which we originally installed in 2003. The asset was nearing its 20 year design life and was changed as part of a planned strategy to ensure the latest...
Gt Billing STW

Gt Billing STW

Utile were able to design, manufacture, supply and install 2 new, Sattler, B9 122/250 Double Membrane 2,150m3 ground mounted Gas Holders and associated 6 mast Lightning Protection System in accordance with BSEN62305, rolling sphere method to LSP1 protection.

Gas Holder for SynGas

Gas Holder for SynGas

Utile were chosen to design, supply and install this Sattler 400m3, Model B9 116/295 ground mounted double membrane as part of a wider scope of supply, to ensure the latest technology was incorporated into the process stream.

Narburn STF

Narburn STF

Utile were awarded the contract by Yorkshire Water Services to deliver a replacement ground mounted gas holder for their Narburn Sewage Treatment Facility in July 2020

Lundwood STW

Lundwood STW

Utile were chosen to replace the original Kirk Environmental tank mounted double membrane gas holders at this Yorkshire Water site with Sattler 624m3 Model DMGS-TM-16.76M versions.