Contracted by Borough Engineering, this duty/standby natural gas booster package is destined for Southbank Place, Canary Wharf, London. Fully packaged to IGE/UP/2, UKCA and ATEX standards for installation within a zoned area, it comes fully CompEx wired.
Utile has supplied a double (duty & assist) gas booster package with acoustic enclosures, and all relevant mechanical and electrical protection equipment in accordance with IGEM/UP/2, EPS, and CE requirements, for installation in a large manufacturing facility to raise the mains gas pressure feeding the new CHP system.
Utile have recently installed and commissioning into service a new 330m3 Sattler model B9 119/205 ground mount, double membrane gas holder for Yorkshire Water at this site. This included new duty/standby air blowers, level and gas measurement as well as an over pressure valve.
Situated in Dorset, this 35mtr diameter Digestate Storage Tank was fitted with a Sattler HSR-E series emissions cover, when originally fitted in 2011 by Weltec as part of a complete Biogas Plant installation.