Riverside STW – Thames Water Utilities Ltd
Interserve Project Services Ltd (IPSL) chose Utile to design, supply, install and commission 2No. 4050m3 Sattler, double membrane gas holder to this site for TWUL.

Interserve Project Services Ltd (IPSL) chose Utile to design, supply, install and commission 2No. 4050m3 Sattler, double membrane gas holder to this site for TWUL.

In association with Energypac Power Generation, Utile have been awarded the contract to design, manufacture and commission 3No. Gas Compressor Packages to feed 3.6MW Rolls Royce engines, for the power plant at the new Jamuna Future Park in Dhaka.

Utile have been awarded the contract to refurbish six digester tanks at Lundwood, Sandall and Woodhouse Mill STW respectively, through the ETM/AECOM Joint Venture.

Imtech Meica chose Utile to design, supply, install and commission a 600m3 Sattler, double membrane gas holder to this site for Biffa.

Utile have recently designed and installed a sequential batch digester gas mixing system, for retrofit on one of four digester tanks at their Westwood AD Plant.

Through our newly appointed representative, Energypac Power Generation, Utile have supplied another HD550 Gas Compressor package to feed a 3.3MW Rolls Royce engine for Confidence Cement.