Plympton (Marsh Mills STW) – South West Water

Plympton (Marsh Mills STW) – South West Water

Under AMP 5 and in association with North Midland Construction, Utile have been contracted to supply and install a new Sattler, double membrane Gas Holder, volume 270m3 to replace an old steel tank unit.

Scunthorpe STW – Severn Trent Water

Scunthorpe STW – Severn Trent Water

In association with North Midland Construction, Utile have been contracted to design and install continuous anaerobic digester Gas Mixing Systems in their two existing concrete digester tanks.

Becton & Crossness STW – Thames Water

Becton & Crossness STW – Thames Water

Through the AMP 5 Tamesis Joint Venture, Utile have supplied each of these sites with triple (duty, assist & standby) gas booster packages with acoustic enclosures, non return valves, protection switches and gas line isolation valves.

Trowbridge STW – Wessex Water

Trowbridge STW – Wessex Water

Under AMP 5, in association with MWH Treatment Ltd, Utile were contracted to supply Utile, continuous anaerobic digester Gas Mixing Systems in the 2 new mesophilic anaerobic digesters for this plant expansion.

Blackburn Meadows STW – Yorkshire Water

Blackburn Meadows STW – Yorkshire Water

Under AMP 5, in association with ETM, Utile were contracted to supply Utile, sequential batch anaerobic digester Gas Mixing Systems in the 2 new mesophilic anaerobic digesters at this new Bio-Energy Digestion plant.

Esholt STW – Yorkshire Water

Esholt STW – Yorkshire Water

In association with Morgan Sindall Grontmij JV, Utile are contracted to supply new equipment for the Bio-Energy Plant which extends the existing plant and up-grades to an advanced digestion process of Thermal Hydrolysis Process (THP).