Liverpool WwTW – Sandon Docks

Liverpool WwTW – Sandon Docks

Working with Stortec, Utile have delivered a turnkey air mixing package for United Utilities at Liverpool WwTW, Sandon Dock, for a new digester tank. This equipment incorporated a skid mounted local control panel, fully wired to WIMES, CompEx and Asset standards.

Bourton-on-the-Water

Bourton-on-the-Water

Utile have delivered a turnkey air mixing package for Thames Water at Bourton-on-the-Water STW for a planned upgrade to suit the 2026/2031 design horizon. With Contract placement in May 2024, the installation in the new Thickened SAS Holding Tank was completed and bought on line in May 2025 after some unforeseen delays.

Great Asby WwTW

Great Asby WwTW

Contracted by Ross-Shire Engineering, Utile have designed, delivered, installed and commissioned a rapid air mixing package for United Utilities at Great Asby WwTW. With placed on September 2025 the final installation and completion was in February 2026.

Danesmoor STW

Danesmoor STW

Contracted by Tilbury, Utile have delivered 2No. turnkey air mixing packages for Yorkshire Water at Danesmoor STW on a planned upgrade. With Contract placement in October 2023, the first installation in Tank 4 was completion was in Q1 of 2024.

Chesham STW

Chesham STW

Contracted by Browne, Utile have delivered a turnkey air mixing package for Thames Water at Chesham STW on a rapid turnround basis. With Contract placement in June 2025, final installation and completion was in September 2025.

Poole STW

Poole STW

Contracted by Galliford Try for Wessex Water, Utile have designed, supplied and installed on a turnkey basis, the 850m3 Double Membrane Gas Holder, 3No. Digester Gas Mixing Systems and 2No. Biogas Boosters sets for this site refurbishment. Final commissioning of this plant is due within 2024.