
Southport STW
Contracted by Eric Wright Water we recently supplied and installed a Sattler 3200m3 Model B9 125/250 double membrane gas holder for United Utilities.

Contracted by Eric Wright Water we recently supplied and installed a Sattler 3200m3 Model B9 125/250 double membrane gas holder for United Utilities.

In May 2018 we supplied and installed the first Sattler 1190m3 Model B9 118/250 double membrane gas holder to replace the Kirk Biodome GS218.

Contracted by Northumbrian Water direct, Utile have been chosen to replace the 2No. Kirk Biodome GS218 gas holders with Sattler 1190m3 Model B9 118/250.

Utile Engineering take delivery of a new Doosan H8000, twin 800mm pallet horizontal machining centre.

Utile are pleased to promote their ability to Inspect, maintain, repair or renew your membrane gas holders.

As part of an “Own and Operate” contract for Minrav Infrastructure Ltd, Utile have been selected to supply 3No. new L175HP oil lubricated, sliding vane gas mixing compressor packages to the Beer Sheva STW, to feed their existing digester gas mixing systems.