
Wargrave STW
Contracted by Costain through the Eight 2 0 Partnership, Utile have recently designed, installed and commissioned an 1100m3 Sattler Double Membrane Gas Holder, at, Thames Water Utilities Wargrave STW site.

Contracted by Costain through the Eight 2 0 Partnership, Utile have recently designed, installed and commissioned an 1100m3 Sattler Double Membrane Gas Holder, at, Thames Water Utilities Wargrave STW site.

As part of our ongoing quality review Utile are pleased to announce their accreditation to ISO9001.

An archive article uncovered from a local press release in 1992 highlighting Utile’s long standing influence in the manufacture and supply of Gas Compressors for Digester Gas Mixing Systems.

As part of the overall site refurbishment program, Nomenca have contracted Utile to design, supply and install a 1350m3 Sattler double membrane gas holder for this Wessex Water site.

Utile were selected by Toroshima Europe Projects Ltd to provide gas boosters to feed their hot water boilers with a variable flow of Natural Gas.
Through Doosan Enpure, Utile have supplied a duty/standby biogas booster package to feed the hot water boilers and Waste Gas Burner.